Hi guys, I finished my summer chores a couple of weeks ago. Here are some pics. Mum and the girls love it. I should be back soon with a case building update.
Most excellent update. Worth the wait to see this. john Ninja edit I'm available for adoption. Just sayin.
That's an impressive submerged water cooling setup there. What clock speeds do you have those kids running at?
Epic post! -- That looks incredible Attila, are those glass pedestals home made? they look fantastic!
Mr Miagyi lives on! Very nice setup you have there, I seem to remember some pics of just the bare bones going up a few months back. You work fast
My word. We can see to who the "Husband/Dad of the Year" prize goes to. Very impressive. PS: Mind getting us a front shot af tha wifey? Just kidding
Man, at least a couple of terahertz! No, this fencing system is from our local 'size of a football field' hardware store. Those alu clamps weigh over a kilo each and are precision milled. Each piece of glass is 12mm safety glass and chimes in at 32kg.s a pop. Started work on planning and SU drawings about June/July last year. Began building in November but quickly lost two weeks or so due to very heavy rain. The footing holes I dug kept on filling with water and pretty soon the sides began collapsing. Once all the posts went up it was smooth sailing. I took six weeks leave and Kelly also took leave so this helped greatly. So the building took about four months or so. I'm proud to say it was all built single handed except for the final wiring up of the spa/jacuzzi, that was done by a licensed electrician (I put down the cable ). Thanks everyone.