Ran two benches while waiting for Vega... CPU should be running at 4,6 GHz and the GPU is at 1120/1500MHz [IMG] [IMG]
Hey kim, thanks for the feedback :) What do you mean by "more symmetric"? With regards to colour choice, or the routing of the cables?...
I really expected more feedback once the project was finished..
Done, done, and done :) Got the RAM, tubing, LEDs and dimmer. Only thing missing now are the cable combs, but I'm finally up and running and...
Shuld get my LED pwm dimmer, the cable combs and the norprene tubing soon and be able to install all those things within the next two weeks (I'm...
I now set the multiplier to 46 (4.6GHz) Voltage manually set to 1.35V and LLC to lvl 6.. that way the cpu gets 1.41V under load. maximum...
First test with overclocking: [IMG] I only enabled TPU II in the UEFI, then ran prime95 (max heat) and furmark at the same time. Didn't further...
[IMG] [IMG] [IMG] Well, well, well.. 2 weeks, maybe 48 hours of running and that's what the super clear tubing looks like.. Any ideas as to...
Here we go I applied the glue (Monsoon hardline uv curing adhesive) and brought the tubes out into the overcast day to cure. [IMG] the blue tape...
Got my last package and I really hope I can finish it, leak-test and set up an OS over the next weekend.. I'll be gone for two full weeks after...
Hey guys Thank you so much for the nice words! I hope I can make the time to finish the tubing I've got so far.. and maybe Aquatuning will be so...
Continued to work on my build a little.. I bought 2 metres of this: [IMG] Cut them to pieces, glued them together and painted them black [IMG]...
Cables are all done now, I've got 7 SATA cables and the power cable for my drives done: [IMG] The drives are so close together that it was...
Got to do my MOLEX cables today. This one goes to the Soundcard [IMG] My Minion helped making these, since Christmas season always stresses me...
Thanks, love the 180g remaster on vinyl, so I'll check the digital remaster out ;)
love the idea!
love the craftsmanship!!! But, what is preasure? (has that been asked before?)
Still waiting for the thermal pads to fix the backplates to my cards, the glue for the monsoon tubes, the 45° fitting for the top rad and the uv...
I haz done some work.. Received my new pump and installed it with a 45° fitting to get the tube to the port in the wall. [IMG] [IMG] It's...
Meet my backplates for the raid controller and the soundcard [IMG] [IMG] [IMG] [IMG] I ordered some thermal padding to tape them to the cards.
Separate names with a comma.