Hello everyone, I bring you here a simple mod in the TJ11 with water cooling included, I'm working on it for about 3 months, when have a bit of time to advance more, most of the hardware I already have here another will be updated. Installing the water block in the gpu Making a mid plate to cover the middle fans without restrict the air. More holes for the pass thru fittings Radiator for VGA with the tube Deciding witch fitting is better Testing and measuring the cpu rad in the place Front grill to cover the fans and give a clean look Here is the grill with some mesh behind And testing the front grill with the mesh and fans behind
Hi everyone, here is an update with more pics of the development Had to use a more thin tube because of one arm the holds the MB tray is to close to the middle fan and dont want to squash the water flow This piece of acrylic sustains the back of the middle plate Cover for the 5.25 bays with adjustment for the Res and air vents and side hole for the cables to pass thru As i dont have more mesh like the applicated in the front grill i had to improvise with other Final result of the 5.25 bay cover This is the lead that starts from the pump to the first rad (CPU Loop) Starting from the Res to the pump, then from the pump to the cpu rad, and after being in cpu block falls in that middle line to the 480 rad, that go then to the GPU And top led installed